Application for Adoption of an AMI Deployment Scenario and Associated Cost Recovery and Rate Design (2005)
Feb. 28, 2005
San Diego Gas & Electric
William Reed
This document (Filed March 8, 2007) is the application of San Diego Gas & Electric Company (SDG&E) for adoption of an Advanced Metering Infrastructure (AMI) deployment scenario and associated cost recovery and rate design