Skip to main content

Oncor Electric Delivery Final Report

None

PDF


Oncor and its partners are conducting studies to remove constraints that prevent utilities from using Dynamic Line (DLR) technology. Oncor will install and commission DLR technology at 26 locations distributed along eight transmission circuits located in Bell, Bosque, Falls, Hill, McLennan, and Williamson counties in central Texas. These circuits have been identified as significantly constrained by the Electric Reliability Council of Texas. At each location sensors will be attached to transmission towers. Radio receivers will be installed inside ten substations. The remaining dynamic line components will be housed at a transmission management control center in Dallas. DLR technology uses a tension sensing device installed directly in a transmission circuit that accurately rates the conductor allowing better line management that enables the reduction of grid congestion. The use of DLR will provide the true transfer capacity of the grid in real time accounting for actual weather conditions. Oncor will demonstrate how installation can be streamlined; optimize the number of monitors required to rate the ; train installation crews in effective installation practices; evaluate current calibration techniques to improve productivity and accuracy; and develop a best practices manual for future installations. Oncor will also demonstrate a technology that monitors line sag/clearances without requiring mounting equipment on the structures or line, which provides the flexibility to move sensors as needed.

The Department of Energy's Office of Electricity (OE) recognizes that our nation's sustained economic prosperity, quality of life, and global competitiveness depends on an abundance of secure, reliable, and affordable energy resources. OE leads the Department of Energy's efforts to ensure a resilient, and flexible electricity system in the United States. Learn more about OE >>

None:prod None build None