Skip to main content

Talquin Electric Cooperative Case Study

March 31, 2012

Talquin Electric Cooperative

PDF


Located in northern Florida, and bordering on the Gulf of Mexico, Talquin Electric Cooperatives (TEC) service territory spans four counties and covers about 2,600 square miles. TECs SmartGrid Program has a total budget of $16.2 million (including $8.1 million of federal cost-sharing through the U.S. Department of Energy's (DOE) Smart Grid Investment Grant (SGIG) program) and deploys advanced metering infrastructure to approximately 56,000 customers and upgrades 46 of 86 circuits with advanced capacitors and switches for voltage control and better outage management.

The Department of Energy's Office of Electricity (OE) recognizes that our nation's sustained economic prosperity, quality of life, and global competitiveness depends on an abundance of secure, reliable, and affordable energy resources. OE leads the Department of Energy's efforts to ensure a resilient, and flexible electricity system in the United States. Learn more about OE >>

None:prod None build None