In October 2013, after a critical 500 kV line between Arizona and California tripped and locked out, standard operating procedures would have resulted in a long delay to restore it to service without risking damage to other equipment. Information from newly installed synchrophasors informed the system operator that the line could be re-energized safely. This rapid restoration avoided re-dispatching generation and reduced the grids vulnerability to additional contingencies.

The Department of Energy's Office of Electricity (OE) recognizes that our nation's sustained economic prosperity, quality of life, and global competitiveness depends on an abundance of secure, reliable, and affordable energy resources. OE leads the Department of Energy's efforts to ensure a resilient, and flexible electricity system in the United States. Learn more about OE >>