NRECA-DCEC
AMI smart meters installed and operational | Quantity* | Cost |
---|---|---|
Total | 0 | $32,570 |
Residential | 5,199 | |
Commercial | 43 | |
Industrial | 1 |
AMI smart meter features operational | Feature enabled | # of meters with feature |
---|---|---|
Interval reads | Yes | 5,243 |
Remote connection/disconnection | Yes | 180 |
Outage detection/reporting | Yes | 5,243 |
Tamper detection | Yes | 5,243 |
AMI communication networks and data systems | Description | Cost |
---|---|---|
Backhaul communications description | All backhaul communications systems are operational(previously reported). | $4,927 |
Meter communications network | All meter communications systems are operational (previously reported). | |
Head end server | Completed 12/20/11 as previously reported. | $3,394 |
Meter data analysis system | MDM service provided by hosted head end site at Landis & Gyr. | |
Other IT systems and applications | SCADA has been integrated for load shedding control (previously reported). |
Web portal deployed and operational | Quantity* | Description |
---|---|---|
Customers with access to web portal | 0 | N/A |
Customers enrolled in web portal | 0 | N/A |
Customer systems installed and operational | Quantity* | Description | Cost |
---|---|---|---|
Communication networks and home area networks | N/A | N/A | |
In home displays | 62 | Completed installation of IHDs (previously reported). Count is dynamic as field conditions change. | $0 |
Energy management device | 0 | N/A | |
Direct load control devices | 573 | Slight activity this quarter. | $0 |
Programmable communicating thermostats | 0 | N/A | $0 |
Smart appliances | 0 | $0 |
Customer system communication networks | Description |
---|---|
Network characteristics within customer premise |
Pricing program | Customers with access | Customers enrolled | Description |
---|---|---|---|
Flat Rate | 585 | 565 | Member customers are charged a uniform energy rate ($/kWh). Enhanced incentive of $4.00/mo. for participating with a water heater controlled by a load control switch (previously reported). |
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.