NRECA-DMEA
AMI smart meters installed and operational | Quantity* | Cost |
---|---|---|
Total | 0 | $0 |
Residential | 0 | |
Commercial | 0 | |
Industrial | 0 |
AMI smart meter features operational | Feature enabled | # of meters with feature |
---|---|---|
Interval reads | No | 0 |
Remote connection/disconnection | No | 0 |
Outage detection/reporting | No | 0 |
Tamper detection | No | 0 |
AMI communication networks and data systems | Description | Cost |
---|---|---|
Backhaul communications description | Aclara, Power Line Carrier | $28,966 |
Meter communications network | Aclara, Power Line Carrier | |
Head end server | $77,242 | |
Meter data analysis system | NISC MDMS, NISC Smart Hub | |
Other IT systems and applications |
Web portal deployed and operational | Quantity* | Description |
---|---|---|
Customers with access to web portal | 31,283 | Smart Hub Web Portal; 11,150 paying monthly via NISC Smart Hub |
Customers enrolled in web portal | 11,150 | NISC SmartHub |
Customer systems installed and operational | Quantity* | Description | Cost |
---|---|---|---|
Communication networks and home area networks | N/A | N/A | |
In home displays | 3 | Aclara In Home Display | $2,146 |
Energy management device | 0 | N/A | |
Direct load control devices | 0 | $0 | |
Programmable communicating thermostats | 0 | $5,322 | |
Smart appliances | 0 | $0 |
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.