NRECA-FEMC
AMI smart meters installed and operational | Quantity* | Cost |
---|---|---|
Total | 0 | $-115,877 |
Residential | 47,459 | |
Commercial | 3,325 | |
Industrial | 755 |
AMI smart meter features operational | Feature enabled | # of meters with feature |
---|---|---|
Interval reads | Yes | 51,539 |
Remote connection/disconnection | Yes | 6,000 |
Outage detection/reporting | Yes | 51,539 |
Tamper detection | Yes | 51,539 |
AMI communication networks and data systems | Description | Cost |
---|---|---|
Backhaul communications description | Backhaul Communications are done through a commercial 64k frame relay circuit | $-7,085 |
Meter communications network | Meter communications are via Aclara TWACS power line carrier communications | |
Head end server | The headend system utilizes the Aclara TNS v2.8 software | $-139 |
Meter data analysis system | ||
Other IT systems and applications |
Web portal deployed and operational | Quantity* | Description |
---|---|---|
Customers with access to web portal | 0 | Customer Service web portal showing usage and billing history. Information is up to previous day. |
Customers enrolled in web portal | 81,071 | Customer Service web portal showing usage and billing history. Information is up to previous day. |
Customer systems installed and operational | Quantity* | Description | Cost |
---|---|---|---|
Communication networks and home area networks | N/A | N/A | |
In home displays | 150 | Aclara Y92500-1 IN-HOME DISPLAYS with PLC connection | $-435 |
Energy management device | 0 | N/A | |
Direct load control devices | 0 | $0 | |
Programmable communicating thermostats | 0 | $0 | |
Smart appliances | 0 | $0 |
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.