Recipient information | Input |
---|---|
Total number of customers served by utility / utilities supporting the project | 66,327 |
Total number of residential customers served by utility / utilities supporting the project | 60,776 |
Total number of commercial customers served by utility / utilities supporting the project | 5,537 |
Total number of industrial customers served by utility / utilities supporting the project | 14 |
Total number of AMI smart meters installed and operational prior to the SGIG/SGD program | 0 |
AMI smart meters installed and operational | Quantity* | Cost |
---|---|---|
Total | 0 | $17,044,537 |
Residential | 61,559 | |
Commercial | 4,143 | |
Industrial | 545 |
AMI smart meter features operational | Feature enabled | # of meters with feature |
---|---|---|
Interval reads | Yes | 66,247 |
Remote connection/disconnection | Yes | 13,850 |
Outage detection/reporting | Yes | 66,247 |
Tamper detection | Yes | 66,247 |
AMI communication networks and data systems | Description | Cost |
---|---|---|
Backhaul communications description | DSL complete to all 40 substations, which communicate with ACLARA servers at our headquarters | $2,075,280 |
Meter communications network | Power Line Carrier communications from substation to meters and back to the substation. | |
Head end server | ACLARA servers installed at headquarters. | $205,958 |
Meter data analysis system | This is inclusive with the MDMS system. | |
Other IT systems and applications |
Web portal deployed and operational | Quantity* | Description |
---|---|---|
Customers with access to web portal | 66,247 | |
Customers enrolled in web portal | 66,247 | Our MDM includes a web portal that allows our member/customers to see their near real time usage and adjust their usage in conjunction with TOU rates (once available). This feature is included at not cost to SKRECC. |
Customer systems installed and operational | Quantity* | Description | Cost |
---|---|---|---|
Communication networks and home area networks | N/A | N/A | |
In home displays | 0 | $0 | |
Energy management device | 0 | N/A | |
Direct load control devices | 1,585 | These devices have been installed on the electric thermal storage heater accounts. These will also be used as part of a water heater/ac load control program in the future. | $310,440 |
Programmable communicating thermostats | 0 | $0 | |
Smart appliances | 0 | $0 |
Customer system communication networks | Description |
---|---|
Network characteristics within customer premise |
Pricing program | Customers with access | Customers enrolled | Description |
---|---|---|---|
Flat Rate | 64,662 | 64,662 | This is an existing rate. |
Flat rate with Critical Peak Pricing | 1,637 | 1,637 | This is an existing rate for the electric thermal storage accounts. |
Net Metering | 64,662 | 3 | This is an existing rate available to all customers. |
* In some circumstances, costs are incurred before devices are installed resulting in a reported cost where the quantity is zero.
* All dollar figures are the total cost, which is the sum of the federal investment and cost share of the recipient (the recipient cost share must be at least 50% of the total overall project cost).
** In some cases the number of entities reporting is greater than the total number of projects funded by the Recovery Act because some projects have multiple sub-projects that report data. View list of sub-projects.